Client
BP
Location
BP International Centre for Business and Technology, Sunbury-on-Thames (BP Headquarters)
Project
Lighting remanufacture across ten campus buildings
Programme
2024-2025
Services
- BSI 8887-220 accredited lighting remanufacturing
- Fluorescent to LED conversion
- Smart Bluetooth lighting controls
- In-situ remanufacturing
- Lighting controls integration

The Challenge
BP wanted to modernise the lighting across ten buildings at its International Centre for Business and Technology in Sunbury while avoiding the cost, disruption and environmental impact of replacing thousands of existing luminaires.
The existing fluorescent lighting was energy intensive, with each fitting consuming 110W, while outdated lighting controls limited functionality, prevented effective dimming and increased maintenance costs. The estate had evolved over time to include four different wired lighting control systems across the ten buildings, resulting in compatibility issues, multiple system failures and little to no effective dimming capability. The existing maintenance contractor also recognised that fluorescent lamps were being phased out, making the long-term maintenance of the installation increasingly difficult.
BP also wanted to retain the existing luminaires due to the ceiling construction, making wholesale replacement both costly and disruptive. In addition, the project needed to comply with strict CIBSE lighting guidelines while maintaining normal business operations throughout the refurbishment. Emergency lighting testing alone was costing approximately £125,000 per year.
The Solution
DRK Lighting adopted a remanufacturing-first approach, upgrading the existing luminaires rather than replacing them.
Across ten buildings, every fitting was converted from a 110W fluorescent system to a high-efficiency 21W LED solution, reducing the power demand of each luminaire by almost 90W while retaining the original housings.
More than 8,500 existing luminaires were retrofitted with new high-efficiency LED boards, drivers and intelligent smart controls rather than replaced. The original louvres were retained and professionally cleaned using an ultrasonic cleaning process, while new diffusers were fitted to improve light distribution and occupant comfort.
The original fluorescent fittings typically delivered approximately 81 lumens per watt. By designing bespoke LED boards in multiple lengths (140mm, 280mm and 560mm) to suit the existing luminaires, DRK achieved lighting efficacy of up to 190 lumens per watt while maintaining like-for-like lighting output.
The project was completed using DRK’s in-situ remanufacturing process, minimising disruption to BP’s day-to-day operations while eliminating unnecessary transport and waste.
To further minimise disruption, works were completed in carefully planned zones and carried out out-of-hours wherever possible, allowing approximately 75% of the office space to remain operational throughout the refurbishment programme. Much of the remanufacturing work was designed and assembled off-site, significantly reducing installation time on site.
Alongside the LED conversion, the buildings were upgraded with HubSense Bluetooth mesh lighting controls, creating one of Europe’s largest single-site deployments of Bluetooth smart lighting. The intelligent control system incorporates PIR occupancy sensing, daylight harvesting and open API integration, allowing lighting to respond automatically to building occupancy and available natural light.
The system utilised an open-source Bluetooth Mesh Networked Lighting Controls (NLC) protocol integrated into the existing Building Management System via the local network and open API. A combination of smart drivers, wireless nodes, PIR occupancy sensors and integrated daylight sensors enabled precise lighting control while allowing lighting levels to be adjusted to achieve the CIBSE-recommended 500 lux for real-world working environments.

Results
The project transformed the lighting performance across the BP campus while demonstrating the benefits of large-scale circular lighting.
Performance Improvements
- Ten buildings successfully remanufactured
- Over 8,500 luminaires retrofitted with new LED boards, drivers and smart controls
- Existing fluorescent fittings upgraded from 110W to 21W LED
- 18,990W reduction in connected load per building
- Intelligent Bluetooth mesh lighting controls installed
- Improved lighting quality and user comfort
- Reduced maintenance requirements
- Future-ready lighting infrastructure
- More than 50% energy savings achieved through the LED upgrade alone
- An additional 60% reduction in lighting energy achieved through intelligent controls
- Lighting performance optimised to meet strict CIBSE lighting compliance
- New remanufactured luminaires supplied with a five-year warranty, including smart controls
- Emergency lighting compliance improved while significantly reducing ongoing testing and maintenance costs
By retaining and upgrading the existing luminaires instead of replacing them, DRK significantly reduced waste while extending the operational life of the lighting installation.

The Impact

Why Remanufacture?
The BP Sunbury project demonstrates how existing lighting assets can be transformed into high-performance, intelligent LED systems without the need for wholesale replacement.
Rather than discarding thousands of perfectly serviceable luminaire housings, DRK retained and remanufactured the existing fittings, dramatically reducing embodied carbon, material waste and installation disruption while delivering substantial operational savings.
By combining high-efficiency LED technology with open-protocol Bluetooth mesh controls, BP now benefits from a future-proof lighting infrastructure capable of adapting to changing workplace requirements without disruption. The project also demonstrates how intelligent controls can not only reduce energy consumption but maintain optimum lighting levels in accordance with CIBSE guidance, improving occupant wellbeing while reducing operational costs.
Combined with intelligent Bluetooth lighting controls, the project has become one of the UK’s largest lighting remanufacture schemes and sets a benchmark for sustainable commercial lighting refurbishment.
It perfectly demonstrates DRK Lighting’s philosophy:
Saving the planet, one remanufacture at a time.

Looking to Extend the Life of Your Lighting?
Whether you’re responsible for a sports venue, commercial building or public estate, remanufacturing can transform existing lighting assets while reducing costs, carbon and waste.
Contact DRK Lighting to discover how our remanufacturing process can deliver high-performance lighting without replacing what already works.